波多野结衣 无码,男女性杂交内射妇女BBWXZ,偷看少妇自慰xxxx,老师你兔子好软水好多视频

葛利茲模具鋼材-名佳利銅帶材-新東透氣鋼華南區(qū)代理之產(chǎn)品展示

透氣鋼冷卻管的安裝方法(如果必要)

在porcerax II透氣鋼使用dichtol密封膠前,有一點至關(guān)重要,必須將EDM液體或者其他切削油是從鋼毛孔徹底清除。如果不這樣做,將大大增加由于水泄漏是由于dichtol密封膠無法滲入毛孔或者使密封膠脫落,引起的泄露會使污染物占據(jù)porcerax II透氣鋼的氣孔。

密封水管線前的清洗程序:

Porcerax II
Sealing Water Lines in Porcerax II with Dichtol
Before applying Dichtol to waterlines in Porcerax, it is imperative that all EDM fluids and other cutting oils be completely removed from the pores of the steel. Failure to do so greatly increases the risk of water leaks due to the inability of the Dichtol to leach into the pores; the contaminants will occupy the pores of the steel or will prohibit the Dichtol from bonding to the surfaces.
Cleaning Procedures Before Sealing Water Lines:
Step 1.
Heat the block of Porcerax II to 300°F for at least (1) one hour. This will open the pores and thin the fluids, allowing most of the trapped material to wick from the steel.
Step 2.
After cooling to room temperature, soak the Porcerax II insert in an ultrasonic cleaner (built for flammable solvents) filled with acetone. These units have spark-proof switches, water chillers and are temperature monitored. This is the only recommended type cleaner for cleaning Porcerax II.
Clean for approximately 1 to 4 hours, depending on insert size, back flushing with filtered shop air and changing the acetone after every hour. When the acetone remains clear the insert should be clean.
Step 3.
Dry with filtered shop air, and let stand overnight.
Note: In addition to the other cleaning methods, it may be necessary to back-flush the Porcerax II inserts with acetone, using air pressure, in order to thoroughly clean the inserts. Care should be taken when using solvents under pressure.
Note: Any hot substance introduced to acetone will cause a flash fire! Make absolutely sure the Porcerax II block is at room temperature!
Applying the two types of Dichtol sealant to Porcerax II waterlines.
Step 4.
Cover all water line inlets but one with a suitable tape. After tape has been applied, stand piece on edge and fill water line through the one remaining open line with Dichtol "WFT" for the 7 micron size. Use Dichtol Macro for 20 micron size. Apply tape over the one remaining water line inlet.
Step 5.
Slowly rotate the piece in all directions to insure the Dichtol is evenly distributed throughout the water line circuit. Let stand for 15-20 minutes.
Step 6.
Remove the piece of tape from the water line where Dichtol "WFT" was first poured into the insert. Pour the Dichtol from the insert back into the container for reuse.
Step 7.
Let stand empty 2 hours.
Step 8.
Re-tape the original hole, and uncover a hole on the opposite side of the insert.
Step 9.
Pour in Dichtol "Macro" for all micron sizes.
Step 10.
Repeat steps 5 & 6.
Step 11.
Allow 24 hours drying time before applying water pressure to the piece.
Note: Dichtol that has cured can only be removed with Methylene Chloride, Acetone or Dichtol Remover.
Note: Dichtol can be obtained from Devitt Machinery, Aston, PA. Tel: (610)494-2900.
Diamant Metallplastic is the worldwide operating manufacturer of Dichtol for the impregnation of micropores. For more information on Dichtol, visit their website:
本文出自*港峰公司*,轉(zhuǎn)載請注明出處!

發(fā)表時間:2016/5/12 19:18:48打印此頁 推薦給好朋友 收藏此頁
關(guān)于港峰產(chǎn)品展示葛利茲特鋼名佳利銅帶鑼磨加工技術(shù)資料企業(yè)資訊聯(lián)系我們站內(nèi)搜索(百度LOGO)
Copyright © 2005-2016 GangFeng Corporation,All Rights Reserved  粵ICP備16032059
主站蜘蛛池模板: 巧家县| 昆明市| 老河口市| 建宁县| 赣州市| 含山县| 八宿县| 鹿邑县| 寿阳县| 定兴县| 宜兴市| 平度市| 焦作市| 德阳市| 应用必备| 平度市| 康定县| 龙胜| 湖南省| 偏关县| 亳州市| 绍兴市| 德令哈市| 乳源| 南漳县| 齐河县| 长阳| 中江县| 玛纳斯县| 石台县| 聊城市| 博湖县| 黔江区| 临城县| 明光市| 桦川县| 新乐市| 镇坪县| 黑山县| 民县| 壤塘县|